Kohler K-T10113-4-BV Guia de Instalação Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 32
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
Install the Upper Shroud
Position one half of the upper shroud onto the lower shroud.
Align the two holes in the side of the upper shroud with the tabs of the lower shroud; secure with
the cap screws.
Repeat for the second half of the upper shroud.
Secure both halves of the upper shroud to each other with two cap screws in both the front and
back.
1/4-20 Cap Screw
Cap Screws
Cap Screws
Upper Shroud
Kohler Co. 11 1114139-2-A
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 31 32

Comentários a estes Manuais

Sem comentários