Kohler K-9669-CP Guia de Instalação

Consulte online ou descarregue Guia de Instalação para não Kohler K-9669-CP. KOHLER K-9669-CP Installation Guide Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 1
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
2000 Kohler Co.
GRIP RAILS
Position the grip rail so the setscrews are to the bottom.
Press the grip rail fully onto the studs. Then push down-
ward on the grip rail so the narrow slots in the grip rail fit
over the grooves in the studs. Use a 3/32” ball style hex
wrench to securely tighten the grip rail setscrews. Make
sure the grip rail is secure.
Repeat for the other grip rail.
1001107-2-A
Inside Bath Wall
Grip Rail
Stud
Setscrew
Under
Grip Rail
Setscrew
Under
Grip Rail
Stud
Vista de página 0
1

Resumo do Conteúdo

Página 1

 2000 Kohler Co.GRIP RAILS  Position the grip rail so the setscrews are to the bottom. Press the grip rail fully onto the studs. Then push down-w

Comentários a estes Manuais

Sem comentários